Office Relocation Checklist: Plan the Move Around Your Team and IT
A workplace move works best when each department knows what is moving, where it will arrive and who is responsible for disconnecting sensitive equipment. Appoint a move lead, confirm both buildings’ access rules and agree a schedule that protects your working hours.
Tag assets before packing
Use a simple tag that identifies the department, owner or workstation and destination room. Keep a separate list for monitors, printers, shared equipment and items that must remain with a named employee. Mark crates consistently and keep confidential files under your company’s control.
Coordinate IT shutdown and server handling
Your IT provider should back up data, shut down devices, disconnect cables and label connections before movers handle equipment. Tell us which items need extra protection, including server racks, networking equipment and sensitive screens. Anti-static materials and equipment-specific packing can be planned where appropriate; specialist disconnection and recommissioning should remain with your IT team.
Choose a practical move window
Ask both property managers about loading bays, goods lifts, access cards, insurance documents and permitted working hours. For moves outside normal hours or at weekends, confirm security staffing and access in writing. Prepare a floor plan for the new office and a first-day essentials list so priority workstations are placed first.
Sequence the work around IT and building access
Build the schedule with your facilities and IT contacts before packing begins. Set a clear cutoff for equipment that must remain online, identify who is authorized to disconnect it, and confirm when the new office can receive the crew. Where the move spans several floors or teams, stage the work by area and agree a handover point for each one. The moving crew can handle the agreed packing, labelled transport and furniture placement; your IT provider remains responsible for data, shutdown and recommissioning unless those tasks are separately agreed.
Request an office move plan: send both addresses, your preferred date, access windows and a rough inventory to WhatsApp +971 56 311 0141.
Office move handover checklist
- Assign one move lead for staff, facilities and the moving crew.
- Keep a department or workstation list that matches the new floor plan.
- Confirm access, loading and lift times at both addresses.
- Back up and disconnect IT equipment through your appointed IT team.
- Agree who will sign off the delivery and report any issue at handover.
For the physical relocation scope, review Falcon Movers Cargo office relocation. If the destination is in a DMCC-managed building, use the DMCC office move planning guide and confirm current requirements with building management.
Should movers disconnect or restart office servers?
That should be agreed with your IT provider. Falcon can plan packing and transport for the items included in the written scope, while data backup, shutdown and recommissioning stay with the authorized IT team unless separately confirmed.